|
SNo | Tender Description | Date | Files | Status
|
| 1
| BHEL PSSR SCT 1393 TENDER SPECIFICATION No. BHEL PS SR SCT 1393
Handling at Site Stores / Storage yard, Transportation to Site of Work, Application of Refractory , Insulation Work and connected work for Boiler and its auxiliaries ,ESP, Ducting and Piping works for Unit –2 of 1 x 500 MW Stage – II at Bellary TPS ,Kudatini Village, Bellary ,Karnataka State
| 03/05/2019
|
|
|
| 2
| BHEL PSSR SCT 1427 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries include supply and application of final painting for units -1&2 of 2x800MW sets at Sri Damodaram Sanjeeviah TPP, Krishnapatnam, Near Nellore, AP
| 06/09/2010
|
|
|
| 3
| BHEL PSSR SCT 1420 Handling at site stores / storage yard, transporting to site, inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & supports, chemical cleaning / pickling, oil flushing, water flushing, hydro testing & steam blowing, surface finishing, supply & application of primer & finish paints including labeling & flow direction on the piping over insulation & hangers and supports, pre-commissioning, commissioning, trial operation & handing over to customer of Power cycle piping and its associated items / systems, hangers and supports, valves, miscellaneous equipments and other equipments supplied under SG & TG packages for Unit – 1&2 of North Chennai TPS 2x600 MW, STAGE – II , M/s TNEB, Athipattu, NCTPS, Chennai
| 24/08/2010
|
|
|
| 4
| BHEL PSSR SCT 1421 Construction of 2 nos of 100Mtr RCC Chimney-civil, Structural, Electricals, C&I and allied works for Paradip Refinery Project CPP at IOCL Paradip, Orissa.
| 20/08/2010
|
|
|
| 5
| BHEL PSSR SCT 1410 EXPRESSION OF INTEREST FOR VARIOUS TYPES OF WORKS BEING EXECUTED BY BHEL PSSR CHENNAI
| 09/08/2010
|
|
|
| 6
| BHEL PSSR SCT 1419 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Controls & Instrumentation Package for Unit-2 of 1 x 500MW at BellaryTPP, Kudithani, Bellary District, Karnataka
| 05/08/2010
|
|
|
| 7
| BHEL PSSR SCT 1418 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrical and Controls & Instrumentation / Electrical works Package for units-1 & 2 of 2 x 500 MW units at NTECL Vallur TPP, Kuruvimedu, Ponneri TK, Tiruvallur Dist, Tamilnadu.
| 05/08/2010
|
|
|
| 8
| BHEL PSSR SCT 1412 Handling at site stores / storage yard, transportation to site of work, Erection, Testing and Commissioning of Boiler Structures, Pressure Parts, Non Pressure Parts, Rotating Machines including Supply & Application of Final Painting for Unit- 1&2 of 2 x 600 MW sets at Jindal India Thermal Power, Derang, Angul, Orissa
| 22/07/2010
|
|
|
| 9
| BHEL PSSR SCT 1405 Handling at site stores / storage yard, Transportation to site of work, Application of Refractory & Insulation materials and connected works for Boiler and its auxiliaries and Piping works for units-1 & 2 of 2 x 500 MW units at NTECL Vallur TPP, Kuruvimedu, Ponneri TK, Tiruvallur Dist, Tamilnadu.
| 17/07/2010
|
|
|
| 10
| BHEL PSSR SCT 1406 TENDER SPECIFICATION No. BHEL PS SR SCT 1406
Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 600 MW Unit 1&2 at Jindal India TPS, Derang village, Angul, Orissa State
| 16/07/2010
|
|
|
| 11
| BHEL PSSR SCT 1407 TENDER SPECIFICATION No. BHEL PS SR SCT 1407
Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 80 MW CPP Units at Sterlite Industries (Indi) Ltd, Tuticorin, Tamilnadu State
| 16/07/2010
|
|
|
| 12
| BHEL PSSR SCT 1413 Handling at site stores / storage yard, Transportation to site of work, Erection, Testing and Commissioning of 2x85TPH Heat Recovery Steam Generators (HRSG) + 4x270TPH Utility Boilers along with their Auxiliaries including Supply & application of Final Painting for the MRPL Phase-III 122MW Co-Generation CPP at Mangalore, Karnataka.
| 09/07/2010
|
|
|
| 13
| BHEL PSSR SCT 1404 Handling at site stores / Storage yard, Transportation to Site of work, Erection, Testing and Commissioning of Frame V Gas Turbine , Generator its Auxiliaries ,Balance of Plants and Piping including Supply and Application of Final Painting for unit 4 of 1 x 20 MW capacity for Co generation Plant at Chennai Petroleum Corporation
Ltd.,Manali,Chennai
| 05/06/2010
|
|
|
| 14
| BHEL PSSR SCT 1403 Handling at site stores / Storage yard, Transportation to Site of work, Erection, Testing and Commissioning of 1 x 85 TPH Naphtha Fired Heat recovery Steam Generators and its Auxiliaries ,Piping including Supply and Application of Insulation and supply & Application of Final Painting for unit 4 of 1 x 20 MW capacity for Co generation Plant at Chennai Petroleum Corporation Ltd., Manali , Chennai
| 05/06/2010
|
|
|
| 15
| BHEL PSSR SCT 1400 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries including Supply and Application of Final Painting for units 1 & 2 of 2x 500 MW sets at NTPL-Tuticorin Thermal Power Project,Tuticorin, TamilNadu
| 03/06/2010
|
|
|
| 16
| BHEL PSSR SCT 1408 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Boiler Structures, Pressure Parts, Non Pressure Parts and Rotating machines etc including Supply and Application of Final Painting of Unit-1&2 of 2 x 500 MW sets at NTPL Tuticorin Thermal Power Project
| 03/06/2010
|
|
|
| 17
| BHEL PSSR SCT 1409 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection , Testing and Commissioning of Structures, Pressure Parts, Non Pressure parts, Air-preheaters, Ducts, its auxiliaries ,and Rotating Machines including Supply and application of final painting of Main Boiler for unit-1 & 2 of 2 x 600 MW set at Shree Singaji thermal Power Project ( Malwa), Mundi Village, SubPO Sindhkhal, Khandwa District, Madhya Pradesh
| 01/06/2010
|
|
|
| 18
| BHEL PSSR SCT 1402 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and ducts including Supply and Application of Final Painting for units 1 & 2 of 2x 600MW sets at Shree Singaji (Malwa) Thermal Power Project, Khandwa Dist, Madhya Pradesh.
| 01/06/2010
|
|
|
| 19
| BHEL PSSR SCT 1399 Construction of Pile and Pile cap for Foundation in Main Plant (i.e. GTG, ,Utility Boilers, Fuel Oil System, DG Building, FGD Booster, CST, CT Pumps, Transformer, AC Plant, HRSG, STG, Switch Gear Control Building etc) at 231MW CPP Paradip Refinery IOCL Paradip, Orissa
| 25/05/2010
|
|
|
| 20
| BHEL PSSR SCT 1381 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 800 MW sets at Sri Damodaram Sanjeevaiah Thermal Power Plant Nallatur Village ,Near Krishnapatnam, Potti Sreeramulu Nellore , Andhra Pradesh
| 20/05/2010
|
|
|
| 21
| BHEL PSSR SCT 1380 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 1 x 500 MW Unit 3,Kuruvimedu ,ponneri Taluk, Tiruvallur District, Tamilnadu
| 20/05/2010
|
|
|
| 22
| BHEL PSSR SCT 1359 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 1 x 600 MW sets at Kakatiya Thermal Power Project, Stage-II, Unir-2 ,Chelpur Village, Warangal District, Andhra Pradesh
| 20/05/2010
|
|
|
| 23
| BHEL PSSR SCT 1382 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 525 MW sets at Malibrahmani Thermal Power Project, Angul, Orissa State
| 19/05/2010
|
|
|
| 24
| BHEL PSSR SCT 1376 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 600 MW sets at Shree Singaji Thermal Power Project, Purni Village Sub Branch PO Sindhkhal , Khandwa District , Madhya Pradesh
| 19/05/2010
|
|
|
| 25
| BHEL PSSR SCT 1384 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 6 x 150 MW sets at Aditya Aluminium Project ,Lapanga , Orissa State
| 19/05/2010
|
|
|
| 26
| BHEL PSSR SCT 1383 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for MRPL CPP ( 1 x Fr 5 GTG, 2 x 28.5 MW STG, 4 x 270 TPH utility Boilers and Aux ) MRPL CPP Phase –III 68 MW Plant , Mangalore , Karnataka State
| 19/05/2010
|
|
|
| 27
| BHEL PSSR SCT 1397 TENDER SPECIFICATION No. BHEL PS SR SCT 1397
Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection , Testing and Commissioning of LT Electrical Package for Unit 2 of 1 X 500 MW Stage –II at Bellary TPS ,Kudatini Bellary , Karnataka State
| 17/05/2010
|
|
|
| 28
| BHEL PSSR SCT 1394 TENDER SPECIFICATION No. BHEL PS SR SCT 1394
Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of LP piping and its accessories , Hangers & Supports, Valves, Miscellaneous equipments/ systems and other static equipments including supply and application of final painting for Unit 2 of 1 X 500 MW Stage –II at Bellary TPS ,Kudatini Bellary , Karnataka State
| 12/05/2010
|
|
|
| 29
| BHEL PSSR SCT 1395 TENDER SPECIFICATION No. BHEL PS SR SCT 1395
Handling at Site Stores / Storage yard, Transportation to Site of work , Erection ,Testing and Commissioning of HT Electrical Package for Unit 2, 1 x 500 MW , Stage-II, Bellary Thermal Power Station , Kudatini Village, Bellary , Karnataka State
| 03/05/2010
|
|
|
| 30
| BHEL PSSR SCT 1389 Handling at site stores / storage yard, Transportation to site of work,
Pre-assembly, Erection, Testing and Commissioning of Steam Turbine, Generator and auxiliaries, Part of CW piping, CW pumps and other BOI
Including Supply and Application of Final Painting for Unit 1&2 – 2x600 MW set at North Chennai TPS, Athipattu, Chennai, TamilNadu.
| 22/04/2010
|
|
|
| 31
| BHEL PSSR SCT 1379 Supply and Construction of Removable/Re-erectable type pre-engineered pre- fabricated steel storage sheds on rate contract basis
| 19/04/2010
|
|
|
| 32
| BHEL PSSR SCT 1391 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection , Testing and Commissioning of ESP Electrical Systems for Unit 11 of 1 x 500 MW at Kothagudem Thermal Power Project, Stage VI , Khammam District ,Andhra Pradesh
| 26/03/2010
|
|
|
| 33
| BHEL PSSR SCT 1374 Handling at Site Stores / Storage Yard, Transportation to Site of Work, Erection, Testing and Commissioning of Power Cycle Piping and its accessories, hangers & supports, valves, associated equipments / systems for SG and TG including Supply & Application of Final Painting for Unit-2 of 1x500 MW, stage-II at Bellary Thermal Power Project (For M/s. KPCL) Kudatini, Bellary District, Karnataka State
| 23/03/2010
|
|
|
| 34
| BHEL PSSR SCT 1388 Construction of General civil works in Main Plant and allied Structures including architectural works at Phase III Refinery Project for MRPL-CPP, Mangalore, Karnataka
| 16/03/2010
|
|
|
| 35
| BHEL PSSR SCT 1377 Fabrication & Erection of Structural Steel works in Power House, Bunker, Pipe rack and other misc. Structures for Unit 1&2 of 2 x 600 MW at Malwa Thermal Power Project, Malwa, Khandwa District, MadhyaPradesh
| 10/02/2010
|
|
|
| 36
| BHEL PSSR SCT 1378 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Controls & Instrumentation Package for Unit-11 of 1x500MW at KothagudemTPP, Kothagudem, Khammam District, Andhra Pradesh
| 09/02/2010
|
|
|
| 37
| BHEL PSSR SCT 1375 Construction of 2 nos of 120Mtr RCC Chimney-civil, Structural, Electricals, C&I and allied works at Phase-III Refinery Project for MRPL-CPP, Mangalore
| 13/01/2010
|
|
|
| 38
| BHEL PSSR SCT 1370 BHEL : PSSR : SCT : 1370 Handling at site stores storage yard Transportation to site of work, Erection, Testing and Commissioning of Electrical and Control & Instrumentation Package for Unit 3 of NTPC 2 x 500 MW set at Simhadri TPP Stage –II ,Simhadri , Visakhapatnam, Andhra Pradesh
| 02/01/2010
|
|
|
| 39
| BHEL PSSR SCT 1366 Design of 11KV /415 V -500 KVA substation and 11 KV Over head Transmission
through ACSR Conductors, Erection, Testing , Commissioning , operation and maintenance of 8 Nos of 500 KVA Sub Stations including supply of RCC / Steel Poles, ACSR Conductors, Insulators and other miscellaneous materials for Construction Power Supply and yard lighting for 2 x 500 MW units at Tuticorin TPP, Tamilnadu
| 30/12/2009
|
|
|
| 40
| BHEL PSSR SCT 1371 Fabrication & Erection of Structural Steel in Power House structures, Mill Bunker strucures, Pipe rack & other Misc. Structures for 2x500MW at NTPL Tuticorin Thermal Power Project, Tuticorin, Tamilnadu
| 29/12/2009
|
|
|
| 41
| BHEL PSSR SCT 1368
TENDER SPECIFICATION BHEL: PSSR : SCT 1368
Handling at Site Stores / Storage yard, Transportation to Site of work , Erection, Testing, Commissioning of Electrical and Controls & Instrumentation Package for 1 x 330 TPH Coal fired BFG fired Boiler, 1 x 67.5 MW STG and Turbo Blower at Rastriya Ispat Nigam Limited, Expansion Project, Visakhapatnam ,Andhra Pradesh.
| 09/12/2009
|
|
|
| 42
| BHEL PSSR SCT 1365 TENDER SPECIFICATION BHEL: PSSR : SCT 1365
Handling at Site Stores / Storage yard, Transportation to Site of work, Erection, Testing and Commissioning of HT / LT Electrical Package for Unit 11 of 1 x 500 MW set at Kothagudem Thermal Power Station , Kothagudem, Khammam District , Andhra Pradesh.
| 09/12/2009
|
|
|
| 43
| BHEL PSSR SCT 1369 Handling at Site Stores / Storage yard, Transportation to Site of Work , Erection, Testing, Commissioning of Controls & Instrumentation Package for Unit 5 of 210 MW Stage – III at Rayalaseema Thermal Power Project , VV Reddy Nagar, Kalamalla Post, Cuddapah District, AP
| 02/12/2009
|
|
|
| 44
| BHEL PSSR SCT 1367 Fabrication & Erection of Structural steel in GTG Hall, STG Hall, Pipe Rack, Compressor House, Raw Water Pump House, Fuel Oil Pump Shed, De-aerator Structure and other Misc. Structure at Phase III Refinery Project for MRPL-CPP, Mangalore, Karnataka
| 23/11/2009
|
|
|
| 45
| BHEL PSSR SCT 1364 Receipt, Unloading at Site Stores / Storage Yard, Verification, Stacking and Preservation of Materials / Components for 1x500 MWe Main plant Package at FBRP site for BHAVINI-Kalpakkam, Near Chennai, TamilNadu.
| 16/10/2009
|
|
|
| 46
| BHEL PSSR SCT 1360 Construction of foundations in Main Plant (i.e. Power House, Boiler, ESP, Mill & Mill Bay, TG foundation, ID Deck, Fan foundations and transformer foundations etc). for Unit 1&2 of 2 x 600 MW at Malwa Thermal Power Project, Khandwa , MadhyaPradesh.
| 14/09/2009
|
|
|
| 47
| BHEL PSSR SCT 1362 TENDER SPECIFICATION BHEL PSSR SCT 1362
Handling at Stores / Storage yard, Transportation to Site of work, Application of Refractory, Insulation and connected work for boiler and its Auxiliaries, ESP and Piping works for Unit 8 of 1 x 250 MW Raichur Thermal Power Project , Raichur, Karnataka State
| 01/08/2009
|
|
Closed |
| 48
| BHEL PSSR SCT 1361 Handling at Site Stores / Storage yard, Transportation to Site of Work, Application of Refractory , Insulation Work and connected work for Boiler and its auxiliaries and Piping works for Unit –1 and 2 of 2 x 250 MW CFBC Boiler at Neyveli Thermal Power Station II Expansion, Neyveli, Cuddalore Dist, Tamilna
| 01/08/2009
|
|
Closed |