 |
 |
Power Sector - Southern Region |
|
|
|
 |
 |
 |
| PSSR Tender Notification
|
|
SNo | Tender Description | Date | Files | Status
|
| 1
| BHEL PSSR SCT 1490 Civil including Architectural work for Boiler, ESP, Power House, TG, Mill Bay and other Main Plant buildings & foundations, Super structure work and Fabrication and erection of Structural work for Power House, Mill Bunker Bay & other buildings as per scope and other allied works for unit - 3 of 1 x 700 MW at Bellary Thermal Power Station, Kudatini, Bellary Dist, Karnataka
| 23/01/2012
|
|
|
| 2
| BHEL PSSR SCT 1489 Civil and Structural Steel work for Package-1&2 for 2 x 800 MW at Yeramarus Thermal Power Station, Yeramarus, Raichur Dist, Karnataka.
| 23/01/2012
|
|
|
| 3
| BHEL PSSR SCT 1484 Erection, Testing and Commissioning including Supply & Application of Final Painting for Package-B (consists of Boiler Structures, Pressure Parts, Non Pressure Parts, Rotating Machines of unit-2 and Application of Refractory & Insulation and connected works for Boiler, ESP, Power cycle Piping etc of Unit- 1&2) of 2 x 210 MW sets at Surana TPS, Raichur District, Karnataka
| 09/01/2012
|
|
|
| 4
| BHEL PSSR SCT 1483 Construction of Single flue RCC Chimney 275M height with Brick liner including all civil, electrical and elevator work for unit - 3 of 1 x 700 MW at Bellary Thermal Power Station, Kudatini, Bellary Dist, Karnataka
| 28/12/2011
|
|
|
| 5
| BHEL PSSR SCT 1472 Package A and Package B for Handling at Site Store, Transportation, Erection, alignment, welding, testing and commissioning including supply and application of painting of steam turbine, generator and its auxiliaries and other BOI and part circulating water (CW) system for unit 1and 2.
| 21/09/2011
|
|
|
| 6
| BHEL PSSR SCT 1475 Civil including Architectural work and Structural steel work for unit - 3 of 1 x 700 MW at Bellary Thermal Power Station, Kudatini, Bellary Dist, Karnataka
| 13/09/2011
|
|
|
| 7
| BHEL PSSR SCT 1474 Civil and Structural Steel work for Package-1&2 for 2 x 800 MW at Yeramarus Thermal Power Station, Yeramarus, Raichur Dist, Karnataka
| 13/09/2011
|
|
|
| 8
| BHEL PSSR SCT 1470 BHEL PSSR SCT 1470 Receipt, Unloading & Material Handling from Trucks / Trailers / Transport carriers / wagons etc., transportation to site / site stores & storage yard, verification, stacking, documentation / updating MM package in computer systems for various stages of works & preservation of materials / components of Boiler, TG and their auxiliaries for units-3 Stage-III of 1 X 700 MW at Bellary Thermal Power Station, Kudathini, Bellary Dist., Karnataka state.
| 02/09/2011
|
|
|
| 9
| BHEL PSSR SCT 1469 Receipt, Unloading & Material Handling from Trucks / Trailers / Transport carriers / wagons etc., transportation to site / site stores & storage yard, verification, stacking, documentation / updating MM package in computer systems for various stages of works & preservation of materials / components of Boiler, TG and their auxiliaries for units 1 & 2 of 2 X 800 MW at Yeramarus TPS site, Raichur Dist., Karnataka state.
| 08/08/2011
|
|
|
| 10
| BHEL PSSR SCT 1468 Civil for Boiler, ESP, Power House, TG, Mill Bay and other Main Plant buildings-Foundation, Super structure including Architectural work & other allied works and Structural steel fabrication & Erection for Power House, Mill Bunker Bay, Pipe & cable rack and allied works for unit - 3 of 1 x 700 MW at Bellary Thermal Power Station, Kudatini, Bellary Dist, Karnataka
| 29/07/2011
|
|
|
| 11
| BHEL PSSR SCT 1467 Civil for Boiler, ESP, Power House, TG, Mill Bay and other Main Plant buildings-Foundation, Super structure including Architectural work & other allied works and Structural steel fabrication & Erection for Power House, Mill Bunker Bay, Pipe & cable rack and allied works for units 1&2 of 2 x 800 MW at Yermarus Thermal Power Station, Yermarus, Raichur Dist, Karnataka
| 28/07/2011
|
|
|
| 12
| BHEL PSSR SCT 1466 Pre-bid tie up on back to back basis for Civil, Structural & Balance of Plant for 1x700 MW Combined Cycle Power Plant of Andhra Pradesh Power Development Company Limited (APPDCL) at Nedunoor, Karimnagar Dist, AP
| 16/07/2011
|
|
|
| 13
| BHEL PSSR SCT 1465 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries including Supply and Application of Final Painting for Unit - 1 & 2 of 2x 210 MW sets at Surana TPS, Raichur District, Karnataka.
| 30/06/2011
|
|
|
| 14
| BHEL PSSR-SCT 1464 BHEL PSSR SCT 1464 Handling at Site Store, Transportation, Erection, alignment, welding, NDT, Testing and Commissioning of valves, piping & its supports and insulation, including Supply and Application of Final Painting at IOCL- Paradip Refinery Project, 366MW Co-generation Package, Paradip, Orissa
| 28/06/2011
|
|
|
| 15
| BHEL PSSR SCT 1463 BHEL PSSR SCT 1463 Handling at site stores storage yard Transportation to site of work Pre assembly Erection Testing and Commissioning of Steam Turbine Generator and auxiliaries and other BOI Including Supply and Application of Final Painting for Unit-1&2 of 2x600 MW sets at Jindal India Thermal Power Limited, Derang, Angul, Orissa
| 23/06/2011
|
|
|
| 16
| BHEL PSSR SCT 1450 Civil foundation for Boiler, ESP, Power House, TG, Mill Bay and other Main Plant buildings / structures for units 1&2 of 2 x 800 MW at Yermarus Thermal Power Station, Yermarus, Raichur Dist, Karnataka
| 11/05/2011
|
|
|
| 17
| BHEL PSSR SCT 1455 Civil work-Levelling and Grading works in Coal Handling Plant, Main Plant and Switch yard area for unit- 3 of 1 x 700 MW at Bellary Thermal Power Station, Kudatini, Bellary Dist, Karnataka
| 11/05/2011
|
|
|
| 18
| BHEL PSSR SCT 1459 Handling at site stores / storage yard, Transportation to site of work,
Pre-assembly, Erection, Testing and Commissioning of Steam Turbine, Generator and auxiliaries, and other BOI Including Supply and Application of Final Painting for 2x600 MW sets at Shree Singaji TPP (Malwa), Mundi Village, Sub PO: Sindhkhal, Khandwa Dist, MP
| 02/05/2011
|
|
|
| 19
| BHEL PSSR SCT 1461 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning and completion of trial operation of Boiler & Aux, Rotating Equipments including supply and application of final painting for Unit- 1&2 of 2 x 210 MW sets at Surana TPS, Raichur District, Karnataka.
| 29/04/2011
|
|
|
| 20
| BHEL PSSR SCT 1460 Receipt, Unloading Material Handling from rucks / Trailers / Transport carriers / wagons etc., transportation to site / site stores and storage yard, verification, stacking and preservation of materials / components of Boiler, TG and their auxiliaries for units 1 and 2 of 2 x 210 MW at Surana TPS , Raichur District, Karnataka.
| 21/04/2011
|
|
|
| 21
| BHEL PSSR SCT 1456 Handling at Site Stores / Storage yard, Transportation to Site of Work, Pre assy., Erection, Testing and Commissioning, Supply & Applications of touch-up, preservation and final painting of Controls & Instrumentation Package of 2 X 600 MW Stage II Unit- 1&2 at North Chennai Thermal Power Station, Atthipattu, Chennai – 120, Tamil Nadu.
| 21/04/2011
|
|
|
| 22
| BHEL PSSR SCT 1457 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and supporting structures for a portion of ducts including Supply and Application of Final Painting for units 1 to 6 of 6 X 150MW sets at Aditya Aluminium Project, Lapanga, District Sambalpur, Orissa
| 28/03/2011
|
|
|
| 23
| BHEL PSSR SCT 1458 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and ducts including Supply and Application of Final Painting for units 1 or 2 of 2x 600MW sets at Jindal India Thermal Power Station Derang, Angul, Orissa
| 28/03/2011
|
|
|
| 24
| BHEL PSSR SCT 1454 Handling at Site Stores / Storage yard, Transportation to Site of Work, Pre assy., Erection,
Testing and Commissioning of HT Electrical Package of Unit- 1&2, Supply & Applications
of touch-up, preservation and final painting of above package of NCTPS Stage-II 2x600
MW at North Chennai Thermal Power Station, Atthipattu, Chennai – 120, Tamil Nadu.
| 21/03/2011
|
|
|
| 25
| BHEL PSSR SCT 1453 Handling at Site Stores / Storage yard, Transportation to Site of Work, Pre assy., Erection, Testing and Commissioning of LT Electrical Package of Unit- 1&2, Supply & Applications of touch-up, preservation and final painting of above package of NCTPS Stage-II 2x600 MW at North Chennai Thermal Power Station, Atthipattu, Chennai – 120, Tamil Nadu.
| 17/03/2011
|
|
|
| 26
| BHEL PSSR SCT 1452 Handling at Site Store / Storage Yard, Transportation to Site of Work, Erection,
Testing and Commissioning of 3 Nos. Frame 9E Gas Turbine, Generator and its
Auxiliaries, 2 Nos. of 30 MW Steam Turbine, Generators and their Auxiliaries,
including integral piping and insulation, and Balance of Plant Equipment, including
Supply and Application of Final Painting at IOCL- Paradip Refinery Project, 366MW
Co-generation CPP Package, Paradip, Orissa
| 17/03/2011
|
|
|
| 27
| NIT_9658 SUPPLY AND CONSTRUCTION OF REMOVABLE RE ERECTABLE TYPE PRE ENGINEERED PRE FABRICATED OFFICE BUILDING USING PLASTOCRETE PANELS WITH ASSOCIATED CIVIL WORKS INCLUDING FOUNDATION
| 15/03/2011
|
|
|
| 28
| BHEL PSSR SCT 1451 Handling at site stores / storage yard, Transportation to site of work, Pre-assembly, Erection, Testing and Commissioning of Steam Turbine, Generator and auxiliaries and other BOI Including Supply and Application of Final Painting for of 1x500 MWe set at BHAVINI Kalpakkam PFBR, Kalpakkam Nuclear Power Project, TamilNadu
| 14/03/2011
|
|
|
| 29
| BHEL PSSR SCT 1436 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning and completion of trial operation of Boiler & Aux, Rotating Equipments including supply and application of final painting for Unit- 1&2 of 2 x 525 MW sets at Malibrahmani TPP, Angul, Orissa.
| 10/03/2011
|
|
|
| 30
| BHEL PSSR SCT 1414 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries including Supply and Application of Final Painting for units 1 & 2 of 2x 525 MW sets at Malibrahmani Thermal Power Project, Angul, Orissa.
| 10/03/2011
|
|
|
| 31
| BHEL PSSR SCT 1449 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Controls & Instrumentation for the MRPL Phase-III 122MW Co-Generation CPP at Mangalore, Karnataka
| 24/01/2011
|
|
|
| 32
| BHEL PSSR SCT 1448 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrical works including illumination for the MRPL Phase-III 122MW Co-Generation CPP at Mangalore, Karnataka
| 14/01/2011
|
|
|
| 33
| BHEL PSSR SCT 1433 ERECTION, TESTING AND COMMISSIONING AND COMPLETION OF TRIAL OPERATION OF BOILER & AUX, ROTATING EQUIPMENTS INCLUDING SUPPLY AND APPLICATION OF FINAL PAINTING FOR UNIT -2 OF 1X600MW SET AT KAKATIYA TPP, STAGE II, CHELPUR VILLAGE, WARANGAL DIST, AP
| 06/01/2011
|
|
|
| 34
| BHEL PSSR SCT 1434 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries including supply and application of final painting for unit -2 of 1x600MW set at Kakatiya TPP, Stage II, Chelpur Village, Warangal Dist, AP
| 06/01/2011
|
|
|
| 35
| BHEL PSSR SCT 1441 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of 30TPH Auxiliary Boiler with all its accessories, Instrumentations, Electricals, application of insulation including supply and application of final painting at BHAVINI Kalpakkam, TamilNadu.
| 05/01/2011
|
|
|
| 36
| BHEL PSSR SCT 1445 Handling at site stores / storage yard, Transportation to site of work, Application of Refractory & Insulation materials and connected works for Boiler, ESP, Fans, Piping, Vessels etc for Unit – 1&2 of North Chennai TPS 2x600 MW, STAGE – II, M/s TNEB, Athipattu, NCTPS, Chennai.
| 04/01/2011
|
|
|
| 37
| BHEL PSSR SCT 1423 Civil work – Modification Works of EVR Building in various floors at BHEL, PSSR, Nandanam, Chennai
| 30/12/2010
|
|
|
| 38
| BHEL PSSR SCT 1447 Handling at site stores / storage yard, transportation to site of work, Erection, Testing and Commissioning of Boiler Structures, Pressure Parts, Non Pressure Parts, Rotating Machines including Supply & Application of Final Painting for 6 X 150 MW sets at Aditya Aluminium Project, Lapanga, District Sambalpur, Orissa
| 28/12/2010
|
|
|
| 39
| BHEL PSSR SCT 1442 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and ducts including Supply and Application of Final Painting for units 1 AND 2 of 2x 600MW sets at Jindal India Thermal Power Station Derang, Angul, Orissa
| 20/12/2010
|
|
|
| 40
| BHEL PSSR SCT 1440 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning and completion of trial operation of Boiler & Aux, Rotating Equipments including supply and application of final painting for units-1&2 of 2x800MW sets at Sri Damodaram Sanjeeviah TPP, Krishnapatnam, Near Nellore, AP
| 20/12/2010
|
|
|
| 41
| BHEL PSSR SCT 1435 Handling at site stores / storage yard, transporting to site, inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & supports, chemical cleaning / pickling, oil flushing, water flushing, hydro testing & steam blowing, surface finish, supply & application of primer & finish paints including labeling & flow direction on the piping over insulation & hangers and supports, pre-commissioning, commissioning, trial operation & handing over to customer of LP piping and its associated items / systems , hangers and supports, valves, miscellaneous equipments and other equipments supplied under SG & Aux., TG & Aux. and Common packages for Unit – 1&2 of North Chennai TPS 2x600 MW, STAGE – II, M/s TNEB, Athipattu, NCTPS, Chennai.
| 08/12/2010
|
|
|
| 42
| BHEL PSSR SCT 1438 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrical and Controls & Instrumentation works for 1x20MW CPP at Phase-3, CPCL Manali, Chennai, TamilNadu
| 08/12/2010
|
|
|
| 43
| BHEL PSSR SCT 1431 Handling at site stores / storage yard, Transportation to site of work, Application of Refractory & Insulation materials and connected works for Boiler, ESP, Fans, Piping, Vessels etc for 1x330TPH Boiler (Unit-6) & 1x67.5MW Turbo Generator(Unit-5) at RINL VSP Vizag
| 03/11/2010
|
|
|
| 44
| BHEL PSSR SCT 1422 Construction of General civil works in Main Plant and other allied structures including architectural works for units 1&2 of 2 x 600 MW sets at Shree Singaji TPP (Malwa), Mundi Village, Sub PO:Sindhkhal, Khandwa Dist, MP
| 26/10/2010
|
|
|
| 45
| BHEL PSSRSCT 1416 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and ducts including Supply and Application of Final Painting for units 1 & 2 of 2x 600MW sets at Jindal India Thermal Power Station Derang, Angul, Orissa
| 25/10/2010
|
|
|
| 46
| BHEL PSSR SCT 1417 Construction of General civil works in Main Plant and other allied structures including architectural works for units 1&2 of 2 x 500 MW at Tuticorin Thermal Power Project, Tuticorin
| 22/10/2010
|
|
|
| 47
| BHEL PSSR SCT 1424 Handling at Site Store Storage Yard, Transportation to Site of Work, Erection, Testing and Commissioning of 1 No. Frame V Gas Turbine, Generator and its Auxiliaries, 1 No. Frame VI Gas Turbine, Generator and its Auxiliaries, 2 Nos. of 28.5 MW Steam Turbine, Generators and their Auxiliaries, including integral piping and insulation, and Balance of Plant Equipment, including Supply and Application of Final Painting at Phase III- 1X 122 MW Cogen CPP Mangalore Refinery and Petrochemicals Ltd, Mangalore, Karnataka state.
| 13/10/2010
|
|
|
| 48
| BHEL PSSR SCT 1430 Receipt of material, Unloading & material handling from wagon, trailer, vehicles etc., transportation to site / site storage, verification, stacking and preservation of materials / components at IOCL-Paradip refinery Project - 366MW, Paradip, Orissa state
| 13/10/2010
|
|
|
| 49
| BHEL PSSR SCT 1428 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning and completion of trial operation of Boiler & Aux, Rotating Equipments including supply and application of final painting for units -1&2 of 2x800MW sets at Sri Damodaram Sanjeeviah TPP, Krishnapatnam, Near Nellore, AP
| 20/09/2010
|
|
|
| 50
| BHEL PSSR SCT 1427 Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries include supply and application of final painting for units -1&2 of 2x800MW sets at Sri Damodaram Sanjeeviah TPP, Krishnapatnam, Near Nellore, AP
| 06/09/2010
|
|
|
| 51
| BHEL PSSR SCT 1420 Handling at site stores / storage yard, transporting to site, inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & supports, chemical cleaning / pickling, oil flushing, water flushing, hydro testing & steam blowing, surface finishing, supply & application of primer & finish paints including labeling & flow direction on the piping over insulation & hangers and supports, pre-commissioning, commissioning, trial operation & handing over to customer of Power cycle piping and its associated items / systems, hangers and supports, valves, miscellaneous equipments and other equipments supplied under SG & TG packages for Unit – 1&2 of North Chennai TPS 2x600 MW, STAGE – II , M/s TNEB, Athipattu, NCTPS, Chennai
| 24/08/2010
|
|
|
| 52
| BHEL PSSR SCT 1421 Construction of 2 nos of 100Mtr RCC Chimney-civil, Structural, Electricals, C&I and allied works for Paradip Refinery Project CPP at IOCL Paradip, Orissa.
| 20/08/2010
|
|
|
| 53
| BHEL PSSR SCT 1410 EXPRESSION OF INTEREST FOR VARIOUS TYPES OF WORKS BEING EXECUTED BY BHEL PSSR CHENNAI
| 09/08/2010
|
|
|
| 54
| BHEL PSSR SCT 1419 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Controls & Instrumentation Package for Unit-2 of 1 x 500MW at BellaryTPP, Kudithani, Bellary District, Karnataka
| 05/08/2010
|
|
|
| 55
| BHEL PSSR SCT 1418 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrical and Controls & Instrumentation / Electrical works Package for units-1 & 2 of 2 x 500 MW units at NTECL Vallur TPP, Kuruvimedu, Ponneri TK, Tiruvallur Dist, Tamilnadu.
| 05/08/2010
|
|
|
| 56
| BHEL PSSR SCT 1412 Handling at site stores / storage yard, transportation to site of work, Erection, Testing and Commissioning of Boiler Structures, Pressure Parts, Non Pressure Parts, Rotating Machines including Supply & Application of Final Painting for Unit- 1&2 of 2 x 600 MW sets at Jindal India Thermal Power, Derang, Angul, Orissa
| 22/07/2010
|
|
|
| 57
| BHEL PSSR SCT 1405 Handling at site stores / storage yard, Transportation to site of work, Application of Refractory & Insulation materials and connected works for Boiler and its auxiliaries and Piping works for units-1 & 2 of 2 x 500 MW units at NTECL Vallur TPP, Kuruvimedu, Ponneri TK, Tiruvallur Dist, Tamilnadu.
| 17/07/2010
|
|
|
| 58
| BHEL PSSR SCT 1406 TENDER SPECIFICATION No. BHEL PS SR SCT 1406
Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 600 MW Unit 1&2 at Jindal India TPS, Derang village, Angul, Orissa State
| 16/07/2010
|
|
|
| 59
| BHEL PSSR SCT 1407 TENDER SPECIFICATION No. BHEL PS SR SCT 1407
Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 80 MW CPP Units at Sterlite Industries (Indi) Ltd, Tuticorin, Tamilnadu State
| 16/07/2010
|
|
|
| 60
| BHEL PSSR SCT 1413 Handling at site stores / storage yard, Transportation to site of work, Erection, Testing and Commissioning of 2x85TPH Heat Recovery Steam Generators (HRSG) + 4x270TPH Utility Boilers along with their Auxiliaries including Supply & application of Final Painting for the MRPL Phase-III 122MW Co-Generation CPP at Mangalore, Karnataka.
| 09/07/2010
|
|
|
| 61
| BHEL PSSR SCT 1404 Handling at site stores / Storage yard, Transportation to Site of work, Erection, Testing and Commissioning of Frame V Gas Turbine , Generator its Auxiliaries ,Balance of Plants and Piping including Supply and Application of Final Painting for unit 4 of 1 x 20 MW capacity for Co generation Plant at Chennai Petroleum Corporation
Ltd.,Manali,Chennai
| 05/06/2010
|
|
|
| 62
| BHEL PSSR SCT 1403 Handling at site stores / Storage yard, Transportation to Site of work, Erection, Testing and Commissioning of 1 x 85 TPH Naphtha Fired Heat recovery Steam Generators and its Auxiliaries ,Piping including Supply and Application of Insulation and supply & Application of Final Painting for unit 4 of 1 x 20 MW capacity for Co generation Plant at Chennai Petroleum Corporation Ltd., Manali , Chennai
| 05/06/2010
|
|
|
| 63
| BHEL PSSR SCT 1408 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Boiler Structures, Pressure Parts, Non Pressure Parts and Rotating machines etc including Supply and Application of Final Painting of Unit-1&2 of 2 x 500 MW sets at NTPL Tuticorin Thermal Power Project
| 03/06/2010
|
|
|
| 64
| BHEL PSSR SCT 1400 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and its Auxiliaries including Supply and Application of Final Painting for units 1 & 2 of 2x 500 MW sets at NTPL-Tuticorin Thermal Power Project,Tuticorin, TamilNadu
| 03/06/2010
|
|
|
| 65
| BHEL PSSR SCT 1409 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection , Testing and Commissioning of Structures, Pressure Parts, Non Pressure parts, Air-preheaters, Ducts, its auxiliaries ,and Rotating Machines including Supply and application of final painting of Main Boiler for unit-1 & 2 of 2 x 600 MW set at Shree Singaji thermal Power Project ( Malwa), Mundi Village, SubPO Sindhkhal, Khandwa District, Madhya Pradesh
| 01/06/2010
|
|
|
| 66
| BHEL PSSR SCT 1402 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Electrostatic Precipitator and ducts including Supply and Application of Final Painting for units 1 & 2 of 2x 600MW sets at Shree Singaji (Malwa) Thermal Power Project, Khandwa Dist, Madhya Pradesh.
| 01/06/2010
|
|
|
| 67
| BHEL PSSR SCT 1399 Construction of Pile and Pile cap for Foundation in Main Plant (i.e. GTG, ,Utility Boilers, Fuel Oil System, DG Building, FGD Booster, CST, CT Pumps, Transformer, AC Plant, HRSG, STG, Switch Gear Control Building etc) at 231MW CPP Paradip Refinery IOCL Paradip, Orissa
| 25/05/2010
|
|
|
| 68
| BHEL PSSR SCT 1381 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 800 MW sets at Sri Damodaram Sanjeevaiah Thermal Power Plant Nallatur Village ,Near Krishnapatnam, Potti Sreeramulu Nellore , Andhra Pradesh
| 20/05/2010
|
|
|
| 69
| BHEL PSSR SCT 1380 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 1 x 500 MW Unit 3,Kuruvimedu ,ponneri Taluk, Tiruvallur District, Tamilnadu
| 20/05/2010
|
|
|
| 70
| BHEL PSSR SCT 1359 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 1 x 600 MW sets at Kakatiya Thermal Power Project, Stage-II, Unir-2 ,Chelpur Village, Warangal District, Andhra Pradesh
| 20/05/2010
|
|
|
| 71
| BHEL PSSR SCT 1383 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for MRPL CPP ( 1 x Fr 5 GTG, 2 x 28.5 MW STG, 4 x 270 TPH utility Boilers and Aux ) MRPL CPP Phase –III 68 MW Plant , Mangalore , Karnataka State
| 19/05/2010
|
|
|
| 72
| BHEL PSSR SCT 1382 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 525 MW sets at Malibrahmani Thermal Power Project, Angul, Orissa State
| 19/05/2010
|
|
|
| 73
| BHEL PSSR SCT 1376 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 2 x 600 MW sets at Shree Singaji Thermal Power Project, Purni Village Sub Branch PO Sindhkhal , Khandwa District , Madhya Pradesh
| 19/05/2010
|
|
|
| 74
| BHEL PSSR SCT 1384 Receipt , Unloading at site stores / storage yard, verification, stacking and preservation of materials / components for 6 x 150 MW sets at Aditya Aluminium Project ,Lapanga , Orissa State
| 19/05/2010
|
|
|
| 75
| BHEL PSSR SCT 1397 TENDER SPECIFICATION No. BHEL PS SR SCT 1397
Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection , Testing and Commissioning of LT Electrical Package for Unit 2 of 1 X 500 MW Stage –II at Bellary TPS ,Kudatini Bellary , Karnataka State
| 17/05/2010
|
|
|
| 76
| BHEL PSSR SCT 1394 TENDER SPECIFICATION No. BHEL PS SR SCT 1394
Handing at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of LP piping and its accessories , Hangers & Supports, Valves, Miscellaneous equipments/ systems and other static equipments including supply and application of final painting for Unit 2 of 1 X 500 MW Stage –II at Bellary TPS ,Kudatini Bellary , Karnataka State
| 12/05/2010
|
|
|
| 77
| BHEL PSSR SCT 1395 TENDER SPECIFICATION No. BHEL PS SR SCT 1395
Handling at Site Stores / Storage yard, Transportation to Site of work , Erection ,Testing and Commissioning of HT Electrical Package for Unit 2, 1 x 500 MW , Stage-II, Bellary Thermal Power Station , Kudatini Village, Bellary , Karnataka State
| 03/05/2010
|
|
|
| 78
| BHEL PSSR SCT 1389 Handling at site stores / storage yard, Transportation to site of work,
Pre-assembly, Erection, Testing and Commissioning of Steam Turbine, Generator and auxiliaries, Part of CW piping, CW pumps and other BOI
Including Supply and Application of Final Painting for Unit 1&2 – 2x600 MW set at North Chennai TPS, Athipattu, Chennai, TamilNadu.
| 22/04/2010
|
|
|
| 79
| BHEL PSSR SCT 1379 Supply and Construction of Removable/Re-erectable type pre-engineered pre- fabricated steel storage sheds on rate contract basis
| 19/04/2010
|
|
|
| 80
| BHEL PSSR SCT 1391 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection , Testing and Commissioning of ESP Electrical Systems for Unit 11 of 1 x 500 MW at Kothagudem Thermal Power Project, Stage VI , Khammam District ,Andhra Pradesh
| 26/03/2010
|
|
|
| 81
| BHEL PSSR SCT 1374 Handling at Site Stores / Storage Yard, Transportation to Site of Work, Erection, Testing and Commissioning of Power Cycle Piping and its accessories, hangers & supports, valves, associated equipments / systems for SG and TG including Supply & Application of Final Painting for Unit-2 of 1x500 MW, stage-II at Bellary Thermal Power Project (For M/s. KPCL) Kudatini, Bellary District, Karnataka State
| 23/03/2010
|
|
|
| 82
| BHEL PSSR SCT 1388 Construction of General civil works in Main Plant and allied Structures including architectural works at Phase III Refinery Project for MRPL-CPP, Mangalore, Karnataka
| 16/03/2010
|
|
|
| 83
| BHEL PSSR SCT 1377 Fabrication & Erection of Structural Steel works in Power House, Bunker, Pipe rack and other misc. Structures for Unit 1&2 of 2 x 600 MW at Malwa Thermal Power Project, Malwa, Khandwa District, MadhyaPradesh
| 10/02/2010
|
|
|
| 84
| BHEL PSSR SCT 1378 Handling at Site Stores / Storage yard, Transportation to Site of Work, Erection, Testing and Commissioning of Controls & Instrumentation Package for Unit-11 of 1x500MW at KothagudemTPP, Kothagudem, Khammam District, Andhra Pradesh
| 09/02/2010
|
|
|
| 85
| BHEL PSSR SCT 1375 Construction of 2 nos of 120Mtr RCC Chimney-civil, Structural, Electricals, C&I and allied works at Phase-III Refinery Project for MRPL-CPP, Mangalore
| 13/01/2010
|
|
|
| 86
| BHEL PSSR SCT 1370 BHEL : PSSR : SCT : 1370 Handling at site stores storage yard Transportation to site of work, Erection, Testing and Commissioning of Electrical and Control & Instrumentation Package for Unit 3 of NTPC 2 x 500 MW set at Simhadri TPP Stage –II ,Simhadri , Visakhapatnam, Andhra Pradesh
| 02/01/2010
|
|
|
| 87
| BHEL PSSR SCT 1366 Design of 11KV /415 V -500 KVA substation and 11 KV Over head Transmission
through ACSR Conductors, Erection, Testing , Commissioning , operation and maintenance of 8 Nos of 500 KVA Sub Stations including supply of RCC / Steel Poles, ACSR Conductors, Insulators and other miscellaneous materials for Construction Power Supply and yard lighting for 2 x 500 MW units at Tuticorin TPP, Tamilnadu
| 30/12/2009
|
|
|
| 88
| BHEL PSSR SCT 1371 Fabrication & Erection of Structural Steel in Power House structures, Mill Bunker strucures, Pipe rack & other Misc. Structures for 2x500MW at NTPL Tuticorin Thermal Power Project, Tuticorin, Tamilnadu
| 29/12/2009
|
|
|
| 89
| BHEL PSSR SCT 1368
TENDER SPECIFICATION BHEL: PSSR : SCT 1368
Handling at Site Stores / Storage yard, Transportation to Site of work , Erection, Testing, Commissioning of Electrical and Controls & Instrumentation Package for 1 x 330 TPH Coal fired BFG fired Boiler, 1 x 67.5 MW STG and Turbo Blower at Rastriya Ispat Nigam Limited, Expansion Project, Visakhapatnam ,Andhra Pradesh.
| 09/12/2009
|
|
|
| 90
| BHEL PSSR SCT 1365 TENDER SPECIFICATION BHEL: PSSR : SCT 1365
Handling at Site Stores / Storage yard, Transportation to Site of work, Erection, Testing and Commissioning of HT / LT Electrical Package for Unit 11 of 1 x 500 MW set at Kothagudem Thermal Power Station , Kothagudem, Khammam District , Andhra Pradesh.
| 09/12/2009
|
|
|
| 91
| BHEL PSSR SCT 1369 Handling at Site Stores / Storage yard, Transportation to Site of Work , Erection, Testing, Commissioning of Controls & Instrumentation Package for Unit 5 of 210 MW Stage – III at Rayalaseema Thermal Power Project , VV Reddy Nagar, Kalamalla Post, Cuddapah District, AP
| 02/12/2009
|
|
|
| 92
| BHEL PSSR SCT 1367 Fabrication & Erection of Structural steel in GTG Hall, STG Hall, Pipe Rack, Compressor House, Raw Water Pump House, Fuel Oil Pump Shed, De-aerator Structure and other Misc. Structure at Phase III Refinery Project for MRPL-CPP, Mangalore, Karnataka
| 23/11/2009
|
|
|
| 93
| BHEL PSSR SCT 1364 Receipt, Unloading at Site Stores / Storage Yard, Verification, Stacking and Preservation of Materials / Components for 1x500 MWe Main plant Package at FBRP site for BHAVINI-Kalpakkam, Near Chennai, TamilNadu.
| 16/10/2009
|
|
|
| 94
| BHEL PSSR SCT 1360 Construction of foundations in Main Plant (i.e. Power House, Boiler, ESP, Mill & Mill Bay, TG foundation, ID Deck, Fan foundations and transformer foundations etc). for Unit 1&2 of 2 x 600 MW at Malwa Thermal Power Project, Khandwa , MadhyaPradesh.
| 14/09/2009
|
|
|
| 95
| BHEL PSSR SCT 1362 TENDER SPECIFICATION BHEL PSSR SCT 1362
Handling at Stores / Storage yard, Transportation to Site of work, Application of Refractory, Insulation and connected work for boiler and its Auxiliaries, ESP and Piping works for Unit 8 of 1 x 250 MW Raichur Thermal Power Project , Raichur, Karnataka State
| 01/08/2009
|
|
Closed |
| 96
| BHEL PSSR SCT 1361 Handling at Site Stores / Storage yard, Transportation to Site of Work, Application of Refractory , Insulation Work and connected work for Boiler and its auxiliaries and Piping works for Unit –1 and 2 of 2 x 250 MW CFBC Boiler at Neyveli Thermal Power Station II Expansion, Neyveli, Cuddalore Dist, Tamilna
| 01/08/2009
|
|
Closed |
|
 |
Copyright 2006. BHEL PSSR Chennai - Site Designed and Developed by IT Dept  |
 |
|